Well up at level 8 now (the distortion is the camera lens !)

Now i have some height i can imagine where the oven openign will be as opposed to my drawings and I have decided to go up another level of bricks.

My design is different to others I have seen, it now willbe 9 levels of bricks then a layer which will hold the top slab of concrete, then another brick level which will have "Hebel" block inside for insulation and then covered with a small amount of sand to make the whole thing level.

getting there !!



You can see in the forground the first layer of bricks for the buffet bar/herb garden and the hole in the middle for water to flow away, i will be lining this with thick plastic inside to stop moisture seeping through the bricks.